Zone 3 pipe racks, deep excavation and shoring

In progress 2026

Client: SABIC (Yansab) / SFAA is the contractor / Yanbu Industrial City / Civil

Engineered deep excavation exposing two live 3.0 m diameter GRP cold water pipelines over approximately 400 m, to approximately 7.0 m deep. Self supporting benched face with reinforced shotcrete and a soil nail contingency. Shoring design and structural calculation, dewatering coordination and geotechnical monitoring.

OSHA 29 CFR 1926 Subpart P, SABIC and Yansab SHEM, and Royal Commission requirements. Face stability design to a factor of safety of 1.5 against a Yansab geotechnical baseline, with daily Competent Person monitoring on a live industrial site.

Yanbu Entertainment Complex

In progress 2025

Client: Seven, Saudi Entertainment Ventures / Main contractor: Al Bawani and UCC joint venture / Royal Commission, Yanbu / Civil

Stormwater pipeline network in GRP and uPVC, with manholes, catch basins and grated channels. Earthworks, shoring, dewatering, utility re routing, sewage tie ins, concrete works and finishing, then testing, commissioning and as built documentation.

Al-Maqar West Park

In progress 2025

Client: Royal Commission, Yanbu / Main contractor: SAMA Contracting / Yanbu / Irrigation and landscaping

Supply and installation of a dry deck fountain, construction of its pump room, plumbing and electrical works, controls and automation testing, and supply and installation of the gazebos and the fence.

SEC room and MV power connection

In progress 2025

Client: National Grain Company / SFAA is the contractor / Yanbu / Electrical

Construction of the SEC room, MV and LV cable trench, cable pulling and termination, electrical panels and associated works, then testing and commissioning.

Low voltage power connection requests

In progress 2025

Client: Marafiq / SFAA is the contractor / Jubail and Yanbu / Electrical

LV cable pulling and laying, in duct and direct buried, with cable testing. Smart energy meters, CTs and metering systems, LV breakers and MDB panels. Ducting including excavation, backfill and reinstatement.

Delivered under outline agreement 7300024830.

Comprehensive electrical maintenance

In progress 2025

Client: Saline Water Conversion Corporation / SFAA is the contractor / Haql province / Electrical

Electrical maintenance and inspection of power distribution equipment. Overhaul of 13.8 kV high voltage circuit breakers, and maintenance of transformers, protection systems, battery systems and UPS units.

Ceer electric vehicle manufacturing complex

Complete 2025

Client: Ceer Motors / SFAA is the contractor / Saudi Arabia / Electrical

Installation of electrical cable tray, cable pulling, light fixing, panels and associated components.

Willfar production facility

Complete 2024

Client: Willfar Industrial Company / SFAA is the contractor / Royal Commission, Yanbu / Civil

Design, permitting and construction supervision for a new production facility. Engineering submittals including IFC, shop and as built drawings. Approvals from the Royal Commission, Marafiq and other authorities, third party supervision through an RC approved consultant, and final inspections for operational readiness.

Delivered for an international client entering the Saudi market.

شركة فوق الأفاق

Send us your scope. We will send back a price.

Drawings, a bill of quantities, or a short description are enough to start. We reply within two working days and tell you plainly if a scope is outside what we do.

Send us your scope
Head office